12. Waterborne Floor Paint


12.1 Waterborne epoxy floor primer

Features: two-component, water-based coating product, excellent permeability, can effectively seal the pores of concrete substrate, excellent adhesion.

Application: used for epoxy floor protection of concrete in schools, workshops, laboratories, warehouses and underground garages, with good matching.

12.2 Paint in waterborne epoxy floor

Features: two component, water-based coating product, high wear resistance, strong adhesion, flexibility, good recoating.

Application: it is suitable for coating epoxy floor concrete in schools, workshops, laboratories, warehouses and underground garages.

12.3 Colored waterborne epoxy floor finish

Features: two components, water-based coating products, wear resistance, pressure resistance, impact resistance, chemical corrosion resistance; The surface is smooth, beautiful, elastic and environmentally friendly.

Application: used for epoxy floor coating of concrete in schools, workshops, laboratories, warehouses and underground garages.

Product features

Dust-proof, moisture-proof, acid-proof and alkali resistant, mildew resistant and antibacterial, smooth and seamless;

Soft luster, colorful, easy to clean, durable;

Environmental protection, health, beautiful, oil resistance and good air permeability.

(1) plain processing: according to the condition of plain grinding, repair, dust removal;

(2) waterborne epoxy primer: as long as there is no water or obvious leakage can be constructed, with a certain permeability of qigong, can enhance the strength of the pigment and increase the adhesion of the coating sealing pigment;

(3) Water-based epoxy coating: add water-based epoxy resin into appropriate amount of quartz sand, and spread it evenly with a trowel to increase the thickness and compressive strength of the coating;

(4) Water-based epoxy putty: according to the actual needs of the construction of two to three, the requirements of smooth without holes, no batch knife imprint and sand grinding imprint shall prevail;

(5) waterborne epoxy finish: two rolls of waterborne epoxy finish, and the overall ground is required to be soft, clean and consistent in color after completion;

(6)Construction completion: People can stand on the surface after 36 hours, heavy pressure on surface after 96 hours .(25℃ shall prevail, and the opening time at low temperature shall be moderately extended).