4. Coating Solution Of Petrochemical Industry


4.1 Storage tank supporting system

Refurbishment: waterborne acrylic primer + waterborne acrylic topcoat

New tank: waterborne epoxy zinc rich primer + waterborne epoxy iron intermediate paint + waterborne acrylic polyurethane topcoat

Product features:

Refurbishment: good water resistance, fast drying, convenient construction, good weather resistance.

New tank: excellent salt spray resistance, long-term corrosion resistance, high hardness, high weather resistance, excellent chemical resistance, there are certain requirements for construction.

Construction guidance

The construction site should be well ventilated. If the construction is carried out in a relatively closed place, effective auxiliary facilities, such as industrial fans and fans, should be adopted to strengthen the air circulation in the construction site.

The ambient temperature shall not be less than 5℃, and the surface temperature of the substrate shall be more than 3℃ higher than the dew point temperature

The relative humidity should be less than 80%. If it is continuously cloudy and the relative humidity exceeds 80%, it is recommended to stop construction or use auxiliary ventilation equipment to enhance air circulation and ensure normal dryness.

Do not work outdoors in rain, snow or dew. If the component has been constructed and the paint film is not dry, the method of tarpaulin shielding should be adopted to protect the paint film, or the component will be moved to indoor for protection.

4.2 Coating solution for Oil pipeline

Underground: waterborne coal-tar epoxy paint

Above ground: waterborne epoxy primer + waterborne epoxy intermediate paint + waterborne acrylic finish/polyurethane finish

Product features:

Underground: excellent water resistance, chemical resistance, good adhesion, good flexibility, convenient construction.

Above ground: good water resistance, excellent salt spray resistance, long corrosion resistance, good adhesion, convenient construction.

Construction guidance:

The construction site should be well ventilated. If the construction is carried out in a relatively closed place, effective auxiliary facilities, such as industrial fans and fans, should be adopted to strengthen the air circulation in the construction site.

The ambient temperature shall not be less than 5℃, and the surface temperature of the substrate shall be more than 3℃ higher than the dew point temperature

The relative humidity should be less than 80%. If it is continuously cloudy and the relative humidity exceeds 80%, it is recommended to stop construction or use auxiliary ventilation equipment to enhance air circulation and ensure normal dryness.

Do not work outdoors in rain, snow or dew. If the component has been constructed and the paint film is not dry, the method of tarpaulin shielding should be used to protect the paint film, or the component will be moved to indoor for protection.